The Rise of Design Build Construction

Learn how design-build combines design and construction in one contract to simplify projects, improve collaboration, cut costs, and save time.

Design-build construction is transforming the industry by combining design and construction services under one contract, which simplifies processes and boosts collaboration. A study by the Federal Highway Administration shows that design-build projects reduce project duration by an average of 14% and costs by nearly 3% compared to traditional methods. These efficiencies make design-build appealing for complex projects that demand quick execution and cost control. 

In this blog post, we will explore the key benefits of design-build construction, along with the challenges and solutions it presents. Additionally, we will compare design-build with traditional construction methods to highlight its advantages and potential drawbacks.

What is Design-Build Construction?

Design-build construction is an innovative project delivery method that integrates both the design and construction phases under a single contract. This approach contrasts sharply with traditional methods, such as design-bid-build, where separate contracts are awarded for design and construction.

In Design-build, one entity, known as the Design-builder, is responsible for all aspects of the project, including design, construction, and management of subcontractors. 

Traditional Project Delivery vs. Design-Build Project Delivery

Key Benefits of Design-Build Construction

Improved communication 

One of the primary advantages of design-build construction is the streamlined 

communication it facilitates. By having a single entity responsible for both design and construction, the traditional silos between designers and builders are eliminated. This unified team structure ensures that all stakeholders are on the same page from the outset, reducing miscommunication and the associated errors and delays.

The owner deals with only one entity, simplifying communication and decision-making processes, i.e. there’s just a single point of contact. Designers and builders also work together under a single contract, fostering a more cohesive and efficient working environment. 

Faster project delivery

  • Overlapping Phases: Design and construction work can proceed concurrently, rather than sequentially, reducing the overall project duration. This approach can result in projects being completed up to 33% faster than traditional methods.
  • Integrated Planning: The design-build team can identify and address potential issues early, minimizing delays and ensuring smoother project execution.

Cost efficiency

  • Early Cost Estimation and Budget Control: The design-build team can provide early and accurate cost estimates, allowing for better budget control throughout the project. This approach helps in identifying essential design elements and budgeting accordingly, avoiding costly changes later on.
  • Minimized Change Orders and Unexpected Expenses: The collaborative nature of design-build reduces the likelihood of costly change orders. By involving all stakeholders early in the process, potential conflicts and design flaws can be addressed proactively, minimizing unexpected expenses.

Key Differences between Design-Build Construction and Traditional Construction 

Design-Build vs Traditional Construction
Aspect Design-Build Traditional Construction (Design-Bid-Build)
Project Management
  • Single entity responsible for both design and construction.
  • Collaborative team of architects, engineers, and contractors working from the outset.
  • Streamlined decision-making and minimized miscommunication.
  • Design-build firm manages all aspects, reducing client burden.
  • Separate contracts for design and construction.
  • Owner hires a design firm, then solicits bids for construction.
  • Sequential process can cause communication and coordination issues.
  • Owner responsible for managing contracts, coordination, and disputes.
Efficiency and Timeline
  • Overlapping design and construction phases.
  • Projects can complete up to 33% faster.
  • Sequential design and construction phases.
  • Prolonged timelines as construction begins only after design completion.
Cost Implications
  • Greater cost efficiencies, with potential savings up to 6%.
  • Early collaboration enables cost-saving opportunities and value engineering.
  • Higher costs due to multiple bidding rounds and late-stage design changes.
  • Limited early collaboration increases risk of cost overruns.
Client Engagement
  • Reduced owner responsibility: All aspects managed by the design-build team.
  • Single point of contact simplifies communication.
  • Less expertise required from the client.
  • Greater control over both design and construction.
  • Requires significant client involvement in managing contracts and issues.
  • Time-intensive and demands client expertise.
Decision-Making Authority
  • Centralized authority with the design-build team, streamlining processes.
  • Client retains flexibility in selecting professionals and direct control over the process.
The Pentagon (Source: designingbuildings.co.uk)

A Design-Build Project Example

The Pentagon Renovation Program (PENREN) is recognized as one of the most extensive renovation projects in contemporary history. This project involved the complete renovation of Wedges 2 through 5, which collectively encompassed about 4.5 million square feet of office space.

The contract for the design-build of Wedges 2 through 5 was awarded to Hensel Phelps Construction Co. on September 14, 2001, just three days after the September 11 terrorist attacks. This expedited timeline was necessitated by the need for enhanced security measures following the attacks. 

Project Scope

Size and Complexity: The Pentagon is the largest low-rise office building globally, with a total area of approximately 6.5 million gross square feet. The renovation required stripping each wedge down to its concrete structure to remove hazardous materials like asbestos and lead, followed by the installation of new mechanical, electrical, and plumbing systems. 

Operational Continuity: The renovation had to be executed while maintaining approximately 80% occupancy, which involved relocating about 25,000 military personnel multiple times without disrupting their operations.

Project Outcomes and Achievements

The Pentagon Renovation Program, completed in June 2011 at an estimated cost of $1.8 billion, was initially planned as a 14-year project. However, the timeline was accelerated due to urgent security needs following 9/11, allowing the project to finish four years ahead of schedule. This accelerated completion was made possible in part by the use of the design-build methodology. Key outcomes include: 

Modernized Infrastructure: All MEP systems were replaced with state-of-the-art technology, ensuring improved functionality and energy efficiency: 

  • Miles of Hallways: Approximately 17.5 miles of corridors were part of the renovation effort.
  • Electrical Infrastructure: The project installed over 1,700 miles (2,700 km) of cabling, with more than 100,000 voice, data, and video drops, and 50,000 data faceplates.
  • Drywall Usage: Nearly 500,000 sheets of drywall were utilized in the renovation. 

Enhanced Security: The renovations included blast-resistant windows and upgraded fire safety systems in response to vulnerabilities exposed by the attacks. 

Historical Preservation: The project successfully restored numerous historical elements while accommodating modern needs, demonstrating a balance between preservation and modernization. 

Sustainability: The renovation incorporated LEED (Leadership in Energy and Environmental Design) practices, promoting sustainability through reduced material waste and improved energy efficiency. 

The project received several accolades for its innovative design-build approach, including the Design-Build Institute of America (DBIA) Best Overall National Design-Build Award in 2011

The Pentagon Renovation (Source: defense.gov)

Challenges in Design Build Construction and Solutions

Potential for Limited Design Flexibility

To maintain creative input and innovation, several strategies can be employed:

Early and Continuous Stakeholder Engagement: Encourage open communication between the owner, designers, and contractors from the outset. Regular meetings and updates can ensure that the owner's design preferences are integrated into the project.

Clear Project Requirements: Define project requirements and scope comprehensively at the beginning. This helps in aligning the design-build team with the owner's vision and ensures that design flexibility is maintained within the defined parameters.

Value Engineering: Implement value engineering techniques early in the process to optimize project costs without compromising design quality. This collaborative approach allows for innovative solutions that meet both functional and aesthetic needs.

Risk of Over-reliance on a Single Entity

To mitigate this risk, it is crucial to:

Select Experienced and Reputable Design-Build Firms: Conduct thorough research and due diligence when selecting a design-build firm. Look for firms with a proven track record, relevant experience, and strong references. Ensuring the firm has the necessary expertise and resources can significantly reduce the risk associated with over-reliance.

Clear Performance Metrics and Oversight: Establish clear performance metrics and oversight mechanisms to ensure accountability and transparency throughout the project. Regular monitoring and feedback can help in identifying and addressing any issues promptly.

Legal and Contractual Considerations in Design Build Construction

  1. Scope of Work: Clearly define the design and construction scope to avoid ambiguities. This includes specifying what is included and excluded from the contract.
  2. Performance Warranties: Design-build contractors are typically held to stricter warranty standards than in traditional design-bid-build projects. The contract should outline the performance warranties and the standard of care applicable to both design and construction services.
  3. Liability and Indemnification: The contract should address how liability will be allocated between the design-build entity and the owner. This includes provisions for professional errors and omissions, and how indemnification will be handled.
  4. Insurance and Bonding: Ensure the contract includes proper insurance coverage and bonding requirements. Design professionals may need additional insurance to cover construction services, which are often excluded from their professional liability insurance.
  5. Change Orders and Variations: Clearly define how changes to the original scope of work will be handled. In design-build contracts, changes to the design are often not considered variations but rather part of the contractor's scope.

Risk Allocation and Management

  • Single Point of Responsibility: One of the key benefits of design-build is that it places the risk of both design and construction defects on a single entity, reducing the risk of disputes between separate designers and contractors. 
  • Contractual Provisions: Include contractual provisions that specify the standard of care and liability for design problems. This can help mitigate risks by clarifying responsibilities and expectations.
  • Insurance and Bonding: Proper insurance coverage and bonding can protect the owner from financial risks associated with design and construction defects or delays.
  • Clear Communication and Collaboration: Encourage high levels of collaboration between the design and construction teams to identify and mitigate risks early in the project. This includes regular meetings and clear communication channels.

Compliance with Regulatory Requirements

  • Licensing Requirements: Ensure that the design-build entity complies with state and local licensing requirements for professional engineering and architecture. Many states have specific regulations that govern who can provide these services.
  • Competitive Bidding Laws: Be aware of local laws that may require competitive bidding, which can sometimes conflict with the design-build method. Federal laws may preempt inconsistent state or local requirements, but this can be complex and needs careful navigation.
  • Building Codes and Standards: The contract should specify that the design-build entity is responsible for ensuring that the project complies with all relevant building codes and standards. This includes obtaining necessary permits and approvals.

Design-Build Contract Templates

These UCOP design-build contract templates provide helpful guidance on how to design your own design-build contract.

Effective Communication Strategies for Design-Build Projects

Effective communication is the backbone of successful design-build projects. Here are some tools and techniques for maintaining open lines of communication:

  • Regular Meetings and Updates: Hold regular project meetings and updates to maintain alignment among all stakeholders. These meetings provide a forum for discussing project status, addressing concerns, and making necessary adjustments promptly. Use Cogram to get structured minutes of your online and in-person meetings directly in your template format — to make sure all the discussions are accurately documented and action items are tracked. Cogram is specifically designed for architecture and construction and understands construction and architecture jargon for accurate, meaningful reporting.
  • Co-location: When feasible, co-locate the design and construction teams to enhance collaboration and communication. This can include shared workspaces or regular joint meetings.
  • Technology Tools: Make sure to use up-to-date tools to facilitate communication, such as project management software and digital documentation systems, to maintain a transparent and efficient communication flow. 
  • Clear Decision-Making Protocols: Establish clear decision-making protocols from the project’s outset. Define who has the authority to make specific decisions and outline the process for approvals and changes to reduce ambiguity.
  • Joint Risk Assessment and Communication: Contracts should encourage proactive and cooperative identification of significant project-specific risks and clear communication on how these risks will be handled. This ensures that all stakeholders are informed and aligned on risk management strategies.

Future Trends in Design-Build Construction

Integration of Technology and Innovation

The design-build approach is being revolutionized by the integration of cutting-edge technologies.

Building Information Modeling (BIM): BIM continues to transform the industry, offering a digital representation of a facility's real-world features and functions. By addressing potential issues early in the design process, BIM enhances collaboration, improves accuracy, and shortens project timelines.

Artificial Intelligence (AI): AI plays a growing role in optimizing project scheduling, resource allocation, and risk management. Its predictive algorithms empower construction teams to make informed decisions to improve efficiency. However, AI can also automate many aspects of project documentation management, Cogram produces meeting minutes of online (e.g., Teams and Zoom) and in-person (e.g., on-site and in conference rooms) meetings, directly in a firm’s custom template document. Cogram’s mobile app also allows you to take photos on-site which it can integrate with meeting minutes to produce a complete field report. 

Drones and Virtual Reality (VR): Advanced tools like laser-equipped drones enable precise site surveys, while VR and augmented reality (AR) provide immersive visualizations of future structures, increasing project precision and stakeholder confidence.

Robotics and Automation: The adoption of robotics and automated equipment is accelerating, leading to faster construction times, cost reductions, and enhanced safety. Innovations like autonomous machinery and wearable tech—such as smart helmets and exoskeletons—are reshaping the construction landscape.

Sustainability and Green Building Practices

Sustainability is becoming a cornerstone of modern construction, driving the adoption of eco-friendly materials and energy-efficient designs.

Green Building Materials: Regulatory requirements and client demand are propelling the use of environmentally friendly materials that reduce ecological impact while enhancing occupant well-being.

Energy-Efficient Designs: Construction projects now emphasize renewable energy, advanced insulation technologies like aerogels, and designs that maximize natural light and minimize energy consumption.

Living Building Materials: Innovative materials that reduce greenhouse gas emissions and embodied carbon are gaining traction. Their growing popularity reflects the industry’s shift toward more sustainable practices.

Evolving Client Expectations

Client demands are shifting, with an increasing focus on customization, flexibility, and efficiency.

Customization: Modern clients expect tailored solutions that align with their unique needs. To meet this demand, design-build firms are leveraging technologies like BIM and modular construction to deliver customized, high-quality projects.

Flexibility: The rise of smart buildings and cities has sparked demand for structures capable of adapting to environmental changes and user requirements. Integration with IoT technologies is now a key consideration in meeting these expectations.

Modular and Prefabricated Construction: Modular construction methods are becoming mainstream due to their ability to reduce waste, improve quality, and accelerate timelines. Assembling components in controlled factory environments also ensures a high degree of customization and precision.

Wrapping Up

Design-build construction offers streamlined communication, faster project delivery, and cost efficiency, making it a compelling alternative to traditional methods. However, its success depends on effectively addressing challenges such as limited design flexibility, dependence on a single entity, and legal complexities. As the industry evolves, integrating technology and sustainability practices will enhance the design-build process. The future of design-build construction depends on adapting to changing client expectations and regulatory landscapes, highlighting the importance of selecting experienced partners, setting clear project goals, and maintaining effective communication.